SH1 Hydroseeding
Enviro360 is a leader in providing sustainable environmental solutions for civil infrastructure projects across New Zealand. The SH1 Hydroseeding project showcases our expertise in delivering rapid, effective revegetation along one of the country’s most vital transportation corridors. By utilising industry-leading hydroseeding techniques, we ensured the long-term stability and environmental compliance of this high-profile roading initiative.
The Problem
State Highway 1, a critical artery for New Zealand’s transport network, often requires extensive earthworks and vegetation management to maintain safety and functionality. For this project, exposed embankments and verges posed significant challenges, including soil erosion, sediment runoff, and dust generation. These issues threatened construction timelines, environmental regulations, and the surrounding ecosystems, necessitating a fast and reliable revegetation solution to stabilise the site.
Our Solution
Enviro360 deployed advanced hydroseeding to address the site’s challenges efficiently. Using a custom slurry of certified seed mixes, mulch, and fertilisers tailored to the local climate and soil conditions, we achieved rapid germination and uniform grass coverage across the SH1 project area. This approach stabilised the soil to prevent erosion and minimised sediment runoff into nearby waterways. Our team’s precision application ensured the solution was both cost-effective and environmentally sustainable, delivering a resilient green cover that enhanced the highway’s aesthetic and ecological value.